The air conditioning condenser units arrived today ready to be removed from their crates and craned to the roof.

The first UPS and battery cabinet was put into position, with the remaining 3 units (stage 1) to be moved into position shortly.
The light hangers for the datacentre area were mostly assembled and are ready for installation.
Our fibre guys are working on the provisioning of our first handful of fibre circuits to tie this site into our various networks. They're with the GIS department at the moment to produce the scope of work documents for the contractors. Once they're done, the contractors will start street splicing around the city.
Oh, and yes, someone put cable tray right in front of our webcam, so we'll have to look at moving it again :-)
The first UPS and battery cabinet was put into position, with the remaining 3 units (stage 1) to be moved into position shortly.
The light hangers for the datacentre area were mostly assembled and are ready for installation.
Our fibre guys are working on the provisioning of our first handful of fibre circuits to tie this site into our various networks. They're with the GIS department at the moment to produce the scope of work documents for the contractors. Once they're done, the contractors will start street splicing around the city.
Oh, and yes, someone put cable tray right in front of our webcam, so we'll have to look at moving it again :-)